top of page
West Connex
TIMELINE
Sydney's major 33km road infrastructure project to improving road congestion and reducing travel time for drivers.
2021 - 2022
M4 - M5 ROZELLE INTERCHANGE
Stage 3b is the final stage.
Ascendo Lighting designed and supplied light fittings for emergency, egress, and general lighting.
2019 - 2021
NEW M4 - M5 LINK MOTORWAY
Stage 3a consists of connecting M8 at St Peter's to New M4 at Haberfield.
Ascendo Lighting designed and supplied light fittings for emergency, egress, and general lighting.
2017 - 2020
NEW M5 MOTORWAY (M8)
Stage 2 consists of the New M5 interchange at St Peters and M8 tunnels.
Ascendo Lighting designed and supplied light fitting for Non-Roadway.
2017 - 2019
NEW M4 MOTORWAY
Stage 1 consists of widening the original M4 Motorway and providing a new twin tunnel.
Ascendo Lighting designed and supplied fittings for emergency lighting along tunnelways.
PRODUCTS SUPPLIED FOR PROJECT
bottom of page