top of page
WestConnex New M5 in tunnel.jpg

West Connex

TIMELINE

Sydney's major 33km road infrastructure project to improving road congestion and reducing travel time for drivers.

2021 - 2022

M4 - M5 ROZELLE INTERCHANGE

Stage 3b is the final stage.


Ascendo Lighting designed and supplied light fittings for emergency, egress, and general lighting.

2019 - 2021

NEW M4 - M5 LINK MOTORWAY

Stage 3a consists of connecting M8 at St Peter's to New M4 at Haberfield.


Ascendo Lighting designed and supplied light fittings for emergency, egress, and general lighting.

2017 - 2020

NEW M5 MOTORWAY (M8)

Stage 2 consists of the New M5 interchange at St Peters and M8 tunnels.


Ascendo Lighting designed and supplied light fitting for Non-Roadway.

2017 - 2019

NEW M4 MOTORWAY

Stage 1 consists of widening the original M4 Motorway and providing a new twin tunnel.


Ascendo Lighting designed and supplied fittings for emergency lighting along tunnelways.

PRODUCTS SUPPLIED FOR PROJECT

bottom of page